Kitchen Renovation in Singapore: A Step-by-Step Guide

kitchen renovation in singapore guide

TL;DR – How to Renovate Your Kitchen?

  • Learn the essentials of kitchen renovation: materials, labour, and everything you need.
  • Start by planning your renovation, looking for inspiration, and setting a budget.
  • Plan the overall design of your kitchen from layout optimisation, kitchen zoning and material selection.
  • Consider a few key components of your renovation: custom carpentry timeline and durable finishes.
  • Finishing touches; settle any agreements that should be done at the handover of the project.

Planning a kitchen renovation is not as simple as changing your stove or rearranging your condiment shelves. It's a significant investment that can transform the heart of your home.

Whether you're considering a large-scale kitchen upgrade or refreshing an older space, careful planning is key to a successful outcome. This guide will walk you through the essential steps, from budgeting to choosing the right finishes.

1. Planning and Budgeting Your Renovation

The first step is to define your vision and establish a realistic budget.

U-shaped kitchen layout galley kitchen layout L-shaped kitchen layout

Define Your Needs

Consider your cooking habits, storage requirements, and how you envision using the space. Do you need more counter space, better pantry organisation, or an integrated dining area?

Research & Inspiration

Look at various kitchen styles and layouts. For small kitchen upgrades, consider galley or Lshaped layouts to maximise space. Find small kitchen renovation tips online and browse inspo photos of different kitchen cabinet designs to visualise what you want.

Set Your Budget

Kitchen renovation costs in Singapore can vary widely. Basic updates may start from SGD 5,000 to SGD 10,000; moderate renovations typically fall within SGD 15,000 to SGD 20,000. It ultimately depends on your builder and the expenses you incur for the project.

Allocate funds for demolition, carpentry, countertops, plumbing, electrical work, appliances, and a contingency fund (10-15%) for unexpected expenses.

2. Designing Your Dream Kitchen

Once your needs and budget are clear, it's time to refine the design.

kitchen work triangle

Layout Optimisation

For smaller kitchens, prioritise functionality with an efficient work triangle (sink, stove, refrigerator). Consider whether wet and dry kitchen zoning is suitable for your lifestyle.

Wet and Dry Kitchen Zoning

For BTO kitchen upgrades, separating heavy cooking (wet kitchen, with stove, sink, and highsuction hood) from light prep and entertaining (dry kitchen, with small appliances, island, or bar counter) helps contain cooking smells and maintain a clean aesthetic, especially in open-concept layouts common in Singapore HDBs and condos.

Material Selection

Choose materials that are durable and suitable for Singapore's humid climate. Ensure that these materials do not erode or wear out easily. Look into aluminium kitchen cabinet in Singapore as they are classy and durable.

3. Key Components and Considerations

Custom Carpentry Timeline

Custom cabinetry is often a cornerstone of BTO kitchen upgrades. The timeline typically involves:

  • Design and Measurement: 1-2 weeks
  • Fabrication: 3-5 weeks (as it's often done off-site in a factory)
  • Installation: 3-5 days

Overall, expect custom carpentry to add several weeks to your renovation schedule.

Custom Carpentry Timeline

Choosing Durable Laminate Finishes

Laminates are a popular and cost-effective choice for kitchen cabinets and countertops. Look for high-pressure laminates (HPL) that offer:

  • Scratch and Stain Resistance: Essential for daily kitchen use.
  • Moisture Resistance: Crucial in Singapore's climate to prevent warping.
  • Seamless Edges: Laminates with matching coloured cores eliminate unsightly black lines at joins.
  • Variety: Many small kitchen renovation tips recommend HPL, which offers countless colours, patterns, and textures, including realistic wood grain and stone effects.

4. Renovation Execution and Handover

renovation execution and handover

Engage a Reputable Contractor

Seek recommendations, check portfolios, and ensure they have a proven track record. A good contractor will manage the various trades (plumbing, electrical, tiling, carpentry) and provide a smooth process.

Supervise Progress

Regular site visits and clear communication with your contractor are vital to ensure the project stays on track and meets your expectations.

Final Inspection

Before making the final payment, conduct a thorough inspection to ensure that all work is completed to your satisfaction and that any defects are rectified.

A well-planned kitchen renovation can significantly enhance your home's value and your daily living experience. By considering these steps and key elements, you'll be well on your way to achieving your dream kitchen in Singapore.

Need expert help with your kitchen renovation?

Get in touch with HausBedroom and enjoy a professional’s tips on renovating your kitchen. From wardrobes in Singapore to timeless kitchen cabinets, HausBedroom has got it.

 

Share :

Our Projects

Custom Kitchen Carpentry: A Smarter Choice in Singapore

Why Custom Kitchen Carpentry Is the Smarter Choice in Singapore

TL;DR – Custom Carpentry in Singapore Getting custom kitchen carpentry helps maximise your space and...

The Ultimate Guide to Kitchen Countertops & Backsplashes in Singapore: Materials, Pros & Cons

TL;DR Quartz and sintered stone lead for stain resistance and low maintenance in Singapore’s humidity....

hausbedroom aluminium kitchen cabinet

Aluminum Kitchen Cabinets in Singapore: Better Than Stainless Steel or Plywood?

TL;DR Aluminum cabinets outlast plywood and resist corrosion better than stainless steel in Singapore’s humid...

Scroll to Top